ISO9001/IATF16949 Certified CNC Manufacturer in China | 24h Quotation | Free DFM Support
Most RFQs quoted in 24–48 hours for typical parts. Clear terms, risk-controlled delivery, and documented inspection.
Prefer to start with a process? Explore 5-Axis CNC Machining, Swiss-Type Lathe, Rapid Tooling & Injection Molding.
Fast, reliable quotes — RFQ acknowledgement in ≤2h; most quotes in 24–48h.
Controlled delivery risk — Clear milestones, optional FAI, and in-process checks (see our manufacturing videos).
No “gotcha” terms — Payment, Incoterms, claims window, and validity written plainly; logistics policy at Shipping FAQ.
Data security — NDA supported (yours or ours). See Privacy & Data.
Step 1 — Send RFQ
Attach 3D (STEP/IGES) & 2D (PDF/DWG), specify material, finish, qty, key tolerances, target lead time.
Need DFM on plastics? Start with Rapid Tooling or Injection Molding.
SLA: RFQ acknowledgement ≤2h; quote 24–48h for typical parts.
Step 2 — Confirm PO & Payment
Approve quote and issue PO/PI; align Incoterms and any FAI/PPAP needs. See Packaging for export-safe packing.
SLA: After pre-payment or account approval, we schedule production within 24h.
Step 3 — Production & Shipping
FAI (if required), in-process QC on CTQs, packing, tracked global delivery. Learn our machining depth at 5-Axis CNC and Swiss-Lathe.
SLA: Milestone updates via email or dashboard.
Must-Have
3D files: STEP/IGES
2D drawings: PDF/DWG (mark key dimensions and tolerances)
Material grade and surface finish
Quantity (batch and annual) and target lead time
Nice-to-Have
CTQs and inspection scope (full/sample, CMM points, thread spec)
FAI/PPAP requirements; material/finish certificates
Assembly or functional notes, if relevant
For polymer prototypes, consider fast additive builds before committing to tooling.
5-Axis CNC: 7–12 business days · MOQ 1
Swiss-Type Lathe: 7–15 business days · MOQ 100
Rapid Tooling: 12–20 business days · MOQ 50–100
Injection Molding: 15–30 business days · MOQ 500+
3D Printing: 2–5 business days · MOQ 1
Ranges are guidance; final dates depend on BOM, fixtures/tooling, finishing capacity, and calendar. For export molds, please align specific documentation and shipping plans in advance.
Payment — T/T or L/C; Net 30/45 for approved accounts. First orders typically include a pre-payment ratio stated in the PI.
Incoterms — EXW / FOB / CIF / DDP. Use your courier account or ours.
Warranty & Claims — Conformity to drawing, material, and finish. Claims window: 90 days from delivery with supporting evidence.
Quote Validity — XX days, subject to material market volatility.
Engineering changes after fixture/tooling/material commitment will be re-quoted and may reset the schedule. Any change can shift lead time; we will reconfirm before proceeding. For early iterations, compare rapid tooling versus additive builds to control cost and risk.
CMM and optical metrology, surface roughness, hardness, roundness/cylindricity, and certified thread gauges are available. With shipment we can provide a dimensional report, material/finish certificates, and optional FAI/PPAP as specified in the PO/SOW. Process videos and past case snapshots can be shared upon request.
| Stage | Owner(s) | Key Tasks | SLA |
|---|---|---|---|
| Order Receipt | Sales Rep | Log PO details, send acknowledgement | ≤ 4 hours |
| Order Review | Sales Manager / Finance | Verify contract vs. PO, credit & risk check | ≤ 24 hours |
| Contract Signing | Legal / Finance / GM Office | Contract signing, verify pre-payment | ≤ 2 business days |
| ERP Entry | Production Planner | Create sales order, generate work orders | ≤ 4 hours |
| Technical Review (POC) | Engineer / Production Supervisor | Finalize process, check materials | ≤ 24 hours |
| Material & Subcontract | Materials Control | Issue requisitions/work orders, track readiness | ≤ 1 business day |
| Production Execution | Production Supervisor / Shop | Dispatch jobs, monitor IPQC | Per production plan |
| Exception Handling | Production Supervisor / QC | File exception report, emergency meeting | ≤ 2 hours after issue |
| Order Closure | Production Planner | Update ERP status, archive documents | ≤ 4 hours |
| Project Review | Entire Project Team | Hold review meeting, document lessons | ≤ 5 business days |
| Document Name | Origin / Prepared By | Purpose | Retention Period |
|---|---|---|---|
| Customer Purchase Order (PO) | Customer / Sales | Order basis | 5 years |
| Contract & Addenda | Legal / Sales | Price & terms confirmation | 5 years |
| Pre-payment Voucher / L/C Notice | Finance | Payment confirmation | 5 years |
| Order Acknowledgement | Sales | Customer confirmation | 3 years |
| Production Feasibility Review | Engineering / Production | Process & materials review | 3 years |
| Production Work Order | ERP / Production | Shop-floor execution | 3 years |
| Subcontract Work Order | Materials Control | Subcontract follow-up | 3 years |
| Final Inspection Report | Quality | Quality release | Indefinite |
| Project Review Report | Project Team | Continuous improvement | 3 years |
| Process Stage | Input → Output | Target SLA | Notes |
|---|---|---|---|
| Order Receipt | Customer PO → Acknowledgement | ≤ 4 hours | Business hours only |
| Order Review | Acknowledgement → Review Form | ≤ 24 hours | — |
| Contract Signing | Review Form → Signed Contract | ≤ 2 business days | Legal and management run in parallel |
| ERP Entry | Signed Contract → Sales Order | ≤ 4 hours | — |
| Technical Review | ERP Order → POC Form | ≤ 24 hours | Up to 48h for large projects |
| Material & Subcontract | POC Form → Requisition/Work Order | ≤ 1 business day | — |
| Production Release | Materials Ready → Job Dispatch | Per weekly plan | — |
| Exception Handling | Exception → Report/Approval | ≤ 2 hours | Immediate escalation for critical issues |
| Order Closure | Production Complete → Archive | ≤ 4 hours | — |
| Project Review | Delivery → Review Report | ≤ 5 business days | Mandatory for large orders |